Resources
The Magnum Monthly
Case Studies
Meet Evan
Career growth at Magnum Services is built on hands-on experience, curiosity, and the ambition to keep moving forward. Evan’s journey is a strong example of how showing up ready to learn can turn into a long-term career. After graduating with a diploma in Power...
CANADA – Lightweight Cement: Lighter than water
WELL INFORMATION 2700m (8,858ft) TVD 6500m (21,325ft) TMD 80oC (176oF) BHST CHALLENGE Weak formation causing losses and preventing cement slurry returns to surface. SOLUTION Proper Spacers/Preflushes Proper Cement blend design combined with Magnum additive technology....
USA – Denver Julesburg Basin
WELL INFORMATION 6,500ft (1980m) TVD 17,000ft (5180m) TMD 215oF BHST CHALLENGEBradenhead gas of greater than 200psi (1.4 MPa) after completion of Production Cementing SOLUTION Proper Spacers/Preflushes Proper Cement blend design combined with Magnum additive...
USA North Dakota – Plug and Abandonment (Remedial)
Optimizing time and reducing costs with multi-zonal isolations In North Dakota, Magnum Cementing Services was actively involved in a plug and abandonment project requiring four or more intervals to abandon the well. The engineering, sales and operational teams...